Tucson, AZ
Zoning limits generators at large data centers to backup use, run only for outages, grid instability, utility requests and testing.
Likely no gas route.
Permitted plant: Likely no (Emergency-only rule)Rentals under 12 months, no air permit: Likely no
Ordinance 12268, adopted Aug 5, 2026 and effective 30 days later (Sep 4, 2026), adds Unified Development Code standards for large-scale data centers: any site over 25,000 sq ft of floor area or using more than 20 MW. Either threshold triggers it, so a 5 MW site in a building over 25,000 sq ft is covered. These data centers are allowed only through a Planned Area Development or Planned Community Development rezoning. Proposed generators "must be for backup use only", and the operator must certify that generator operation "will occur only at the request of the electric utility, during grid instability or power outages or for preventive maintenance and periodic testing." Only Tier IV or natural gas / dual-fuel units are allowed where high-emitting generation is proposed. Backup must combine generators with batteries sized for 2 hours. The list of allowed operating occasions does not include running while waiting for a utility connection, so we read it to bar bridge power (our reading; the ordinance does not define "backup" or address bridge power directly). The ordinance does not say how it treats data centers that existed before it.
Permitted gas generation
Generators at large-scale data centers may run only at the utility's request, during grid instability or outages, or for maintenance and testing. Gas units are allowed for that backup role. We read this to rule out a 24/7 or bridge gas plant (our reading).
Rentals kept under 12 months
The limit is on generator operation at the site, not on air permits, so we read it to cover rented units too (our reading; the ordinance doesn't mention rentals). Source
Details
- Who it covers
- large-scale data centers (over 25,000 sq ft gross floor area or over 20 MW) rezoned through PAD or PCD after Sep 4, 2026; treatment of earlier sites not stated
- Where
- City of Tucson only
- Status
- In force
- Effective
- September 4, 2026
- Authority
- City of Tucson, AZ (Mayor and Council, Aug 5, 2026)
- Last checked
- November 8, 2026
Sources
- City of Tucson Ordinance No. 12268 (signed, Aug 5, 2026), UDC 4.9.11.D.3.d and 11.3.11.F primary
Certification that generator operation will occur only at the request of the electric utility, during grid instability or power outages or for preventive maintenance and periodic testing. (UDC 4.9.11.D.3.d.4, p. 3)
- City of Tucson, Regulations for Large-Scale Data Centers (program page) primary
For information only, not legal advice. Confirm with your air agency and fire marshal before you rely on it. Spot an error? Email tyler@relayenergy.us.