Zoning limits generators at data centers to emergency backup and testing; 'emergency' is not defined.

Likely no gas route.

Permitted plant: Likely no (Emergency-only rule)Rentals under 12 months, no air permit: Likely no

Pike County, GA's data center zoning standard says: "The testing of any generators may only be completed between the hours of 9:00 AM EST and 4:00 PM EST and the generators may only be used in the case of an emergency situation." (UDC Sec. 1403.B.5.j (M-1) and Sec. 1503.B.7 (M-2), as read into the Nov 25, 2025 minutes). The ordinance does not define 'emergency' or 'backup' and does not separately bar other on-site generation. We read it as barring a generator fleet that runs 24/7 or as bridge power while a site waits for a grid connection, because that is neither emergency nor backup use (our reading). It does not meet the skill's block test on its own text. The text comes from the Nov 25, 2025 minutes (first reading). The Dec 10, 2025 minutes record the second reading approved 5-0 with 'no proposed changes since the first reading'. The codified text was not found online.

Permitted gas generation

Generator use other than testing is limited to emergency or backup use. Whether a wait for grid service counts as an emergency is not stated (our reading: it does not).

Rentals kept under 12 months

The limit applies to all generator use on the site and does not distinguish owned from rented units. We read it as covering rented units (our reading; the text does not name them). Source

Details

Who it covers
data centers as special uses in M-1 and M-2 (10-acre minimum lot)
Where
Unincorporated Pike County only
Status
In force
Effective
December 10, 2025
Authority
Pike County, GA (Board of Commissioners, Dec 10, 2025)
Last checked
November 8, 2026