Monticello, MN
Data center zoning lets backup generators run only during a power outage; utility curtailment is not an outage.
Likely no gas route.
Permitted plant: Likely no (Outage-only backup rule)Rentals under 12 months, no air permit: Likely no
Monticello requires every data center to be built in a Data Center PUD district (DCPUD). Its standards say: "Back-up power generators within the DCPUD may only be used for back-up electrical supply during a power outage. Curtailment of power supply or voluntary shutdown of power is not considered a power outage." Testing is limited to weekdays 8 a.m. to 5 p.m. To be rezoned, a project must show it 'will be adequately served with electricity supplies for the specified data center demands from the local electric power supplier'. The ordinance lists 'outdoor generators' as accessory support facilities and does not expressly bar a primary generation plant, so we read the outage-only limit, the utility-supply showing and the definition (which names 'back-up power generators') together as ruling out a gas bridge (our reading). Deviations need a variance.
Permitted gas generation
Backup generators may run only during a power outage, and curtailment is not an outage. A wait for first grid service is not an outage, and rezoning requires utility supply (our reading). The text does not expressly name or bar prime generators.
Rentals kept under 12 months
The outage-only limit is on generator use in the district, so we read it as covering rented units (our reading; the text does not name rentals). Separately, the DCPUD bars 'semi-trailer containers' used as storage; whether that reaches trailer gensets is doubtful.
Details
- Who it covers
- all data center and data center campus development in the city (DCPUD required); rezoning needs utility supply for the data center's demand
- Where
- City of Monticello only (Wright County)
- Status
- In force
- Effective
- April 27, 2026
- Authority
- City of Monticello, MN (City Council, Ordinance 865, Apr 27, 2026)
- Last checked
- November 8, 2026
Sources
- Monticello Ordinance 865, Data Center PUD (adopted Apr 27, 2026) primary
Back-up power generators within the DCPUD may only be used for back-up electrical supply during a power outage. Curtailment of power supply or voluntary shutdown of power is not considered a power outage. (Sec. 153.045 DCPUD (10)(h), Ord. 865 p.11)
- Monticello Ordinance 865, rezoning criteria primary
will be adequately served with electricity supplies for the specified data center demands from the local electric power supplier (DCPUD (3)(f), p.4)
For information only, not legal advice. Confirm with your air agency and fire marshal before you rely on it. Spot an error? Email tyler@relayenergy.us.