Bridgewater Township, NJ
Zoning limits every data center generator to outages and testing.
No gas route. Together with New Jersey.
Permitted plant: No (Zoning ban)Rentals under 12 months, no air permit: No
Bridgewater's land use code, effective Sep 23, 2026, says any generator at a data center may run only during an emergency or for testing and maintenance, and defines an emergency as loss of primary power from an outage beyond the data center's control. Only natural gas generators are allowed, since no fuel may be stored on the property, and battery energy storage systems are barred. The rules apply to any data center not already existing in its current condition when the ordinance passed, whether or not a zone or redevelopment plan permits the use.
Permitted gas generation
Any generator may run only during a utility outage beyond the data center's control, or for limited testing. Section 1.a lists 'energy generation systems' as an accessory use, which we read as covering on-site renewables (an on-site renewable source is required), not gas engines run as primary power.
Rentals kept under 12 months
The emergency-only rule covers 'any generator', and no fuel may be stored on the property. Source
Details
- Who it covers
- any data center (2 MW or more per acre) or hyperscale data center not already in existence in its current condition on Sep 3, 2026
- Where
- Bridgewater Township only
- Status
- In force
- Effective
- September 23, 2026
- Authority
- Township of Bridgewater, Somerset County, NJ (Council, adopted Sep 3, 2026)
- Last checked
- November 8, 2026
Sources
- Bridgewater Ordinance 26-15, Section 126-341.6.C.1.c.iii primary
Any generator shall be used only during periods of emergency or for periodic testing and necessary maintenance operations. An emergency shall be defined as the loss of primary power due to power outage beyond the control of the data center.
- Bridgewater Ordinance 26-15, Section 126-341.6.A primary
The following performance standards shall apply to any data center use in the Township, which is not already in existence in its current condition at the time of passage of this ordinance, whether or not the use is permitted by a specific Zone or Redevelopment Plan.
- Patch, Sep 8, 2026 (adoption) secondary
For information only, not legal advice. Confirm with your air agency and fire marshal before you rely on it. Spot an error? Email tyler@relayenergy.us.