York County, VA

Zoning limits data center generators to backup and emergency use, plus testing and commissioning.

Likely no gas route.

Permitted plant: Likely no (Emergency-only rule)Rentals under 12 months, no air permit: Likely no

York County's data center standards say: "Except for generator testing or commissioning activities, generator use is limited to backup/emergency use only." Testing may run one generator at a time, weekdays 5 to 8 p.m. Data centers need a special use permit, and the application must include a letter from the electric utility on the energy source and the load at each phase. The code does not define "backup" or "emergency", so whether it bars a gas bridge while a site waits for grid service is our reading: a fleet run as the site's main supply is not backup (our reading). Same wording as Stafford County.

Permitted gas generation

Generator use is limited to backup and emergency use, testing and commissioning. 'Emergency' is undefined, so a bar on bridge or primary gas generation is our reading.

Rentals kept under 12 months

The limit covers all 'generator use' at a data center, so we read it as covering rented units (our reading; the text does not name rentals). Source

Details

Who it covers
data centers (special use permit, Sec. 24.1-489.1)
Where
York County
Status
In force
Effective
May 19, 2026
Authority
York County, VA (Board of Supervisors, Ord. No. 26-12, May 19, 2026)
Last checked
November 8, 2026

Sources

Check another site Need power here? Talk to us

For information only, not legal advice. Confirm with your air agency and fire marshal before you rely on it. Spot an error? Email tyler@relayenergy.us.